Sunday, February 18, 2007

Build Day 71.....Top Suspension Brackets

Had quite a productive day in the garage today. Firstly, I created a new jig for positioning the top suspension brackets:



This jig bolts to the bottom brackets, then can swing up to align the top ones. First to be tacked on is the top front brackets:



Then, with the wishbone in situ to get the correct gap, the second bracket is positioned. Also, the 'FU' tubes, which I made earlier on, are now also positioned and tacked into place. The brackets are then tacked on to these tubes:



And here is the final result. All brackets in place:

0 Comments:

Post a Comment

<< Home